Active job

Urgent

Job image

Job description

Drainlaying
Christchurch

Urgent job (cost plus or quoted). Carefully excavate and dispose of "bad fill" (up to 40 m3) and expose existing field drain, storm water and sewerage pipes, reinstall and backfill with AP65 compacted in layers nor more than 500mm, place tailings against basement walls and keep separated with geo textiles. Limited access for small excavator of no more than 1.8m wide and 2.4m wide. Repair any damaged services.


Trade professionals

#1 Tradie 1
57 jobs No longer in contact
#2 Tradie 2 No recent reviews 3 jobs No longer in contact
#3 Tradie 3
75 jobs No longer in contact
#4 Tradie 4 No recent reviews 131 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo