Need to have a toilet installed into a renovated en-suite, the cold water feed has already been installed and have been informed that I need consent to have it installed but am unsure what else is required. To be done as soon as possible. I believe there is a new waste pipe needing to be installed, is ample room under the floor as it is on piles. Looking for someone to quote and then complete the job through consent process.
#1 | Tradie 1 |
|
70 jobs | No longer in contact |
Partner with Builderscrack
Get work