1925 Earthquake damaged house is being repaired. Step 1 Foundations to be finished by 20/5/19 Step 2 Framing and cladding, to be finished by 20/7/19 Step 3 Plumbing, electricity etc before gibbing, finished by 15/8/19 Looking for suitably qualified tradesman/ business that is willing to take on job. Sewer pipes for ensuite plumbing (see enclosed drawings) to be positioned in next 2 weeks, as floor is lifted at the moment, all other plumbing and drain laying at times to be discussed
#1 | Tradie 1 | No recent reviews | 59 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 23 jobs | No longer in contact |
#3 | Tradie 3 |
|
40 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 211 jobs | No longer in contact |
Partner with Builderscrack
Get work