Review

Header Tank

Job description

Rainwater Harvesting Systems
Banks Peninsula

header tank is in the ceiling and water has started to flow from the overflow a few hours each day....on inspection it looks ok but I suspect the valve/ballcock is not totally sealing and needs to be replaced......


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great job......these guys were easy to communicate with, rang before they came (as agreed) and were fast , efficient and polite. Charged the quoted price and I was very happy with the work.

Work carried out by the owner/operator
Reviewed on 11-09-2017

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 51 jobs Secured job
#2 Tradie 2 No recent reviews 211 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo