Connect onto copper hot and cold (HWC location). 2 no penetrations through external wall and run hot and cold approx 5m along wall, another 2 penetrations into external wall and fix wingbacks with 2 way valve on cold and iso valve on hot. Run waste from sink (will need supplementary P trap with AAV) whole saw through external wall and run waste to existing gulley / approx 4-5m, will get plenty of fall. Just need water and waste services to location, we can fit everything else off.
#1 | Tradie 1 |
|
264 jobs | No longer in contact |
#2 | Tradie 2 |
|
83 jobs | No longer in contact |
#3 | Tradie 3 |
|
559 jobs | No longer in contact |
#4 | Tradie 4 |
|
62 jobs | No longer in contact |
#5 | Tradie 5 |
|
18 jobs | No longer in contact |
#6 | Tradie 6 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work