Currently have a floor waste in tiles. Going to install vinyl and need to replace current floor waste with a gattic waste prior to installation of the vinyl. Currently do not have the waste so ideally would have this supplied as part of work if possible. Will need to be slightly raised vs current floor height to enable application of leveling compound.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job
Reviewed on 07-07-2021
Partner with Builderscrack
Get work