I would like to obtain quote and time /day at the earliest this can be done. A comprehensive works over approval report that shows the CCTV of the existing connection to my site. The CCTV needs to show the pipe material, gradient, and invert of the connection at the manhole and at my site. I will check the CCTV report to see if the existing connection is usable and whether it conflict with foundation system.
#1 | Tradie 1 |
|
29 jobs | No longer in contact |
#2 | Tradie 2 |
|
216 jobs | No longer in contact |
Partner with Builderscrack
Get work