Small bathroom 1700mm x 2400mm with built in HWC with door in one corner, 2.7m stud. New gib walls & ceilings. Stopping for paint finish. Install coving. Needs to be completed between 1st May and 6th May (Painter starts).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ray was awesome to work with. On the job when planned, kept to timeframe advised and workmanship was top quality. Communicated with client as required. Highly recommend.
Work carried out by the owner/operator
Reviewed on 24-06-2020