1. Remove carpet and vinyl from all floors (approx 140m2); 2. Sand and polish all floors; 3. Remove bathroom suite (bath, over bath shower, toilet and vanity/hand basin); 4. Install new bathroom suite (temporary solution only - our intention is to re-model the bathroom as part of the medium to long term plan); 5. Strip wallpaper off all walls; 6. Plaster all walls and some ceilings (for paint finish); 7. Install new electrical fittings (power plugs, light switches etc). Must be available between 22 October and 15 November
#1 | Tradie 1 |
|
45 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 47 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
#6 | Tradie 6 |
|
88 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 3 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 45 jobs | No longer in contact |
Partner with Builderscrack
Get work