The lounge has been wallpapered - this has mostly been removed, the walls need to be prepared for painting to grade 5 finish, ready for painting. Prepapration and painting of woodwork plus the walls will then be required.
#1 | Tradie 1 | No recent reviews | 10 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 11 jobs | No longer in contact |
#3 | Tradie 3 |
|
78 jobs | No longer in contact |
#4 | Tradie 4 |
|
136 jobs | No longer in contact |
#5 | Tradie 5 |
|
88 jobs | No longer in contact |
#6 | Tradie 6 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work