Interior plastering, quite a small job. Just the gap between new and old gib in photo. Room is 3m x 3.6m. I have two time windows in which to get this done, either: * Now until 5 March * 17 March until 31 March I'm also getting the floor sanded and refinished during the same time windows, so I'll try to get the plastering done before the floor.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work, thanks!
Work carried out by the owner/operator
Reviewed on 28-02-2019
Tradesperson reply
"Thnak you!! Great communications and great job."
Partner with Builderscrack
Get work