Plasterer required to plaster ensuite, measuring 2.73 x 1.85, walls and ceiling to Level 4 paint finish. There are 2 vertical joins where the existing plasterboard meets the new board. It is preferred to have a complete skim coat over the existing walls to cover previous poor work. Immediate start is available.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Matt and Joe are very good at their craft and we highly recommend them. The alterations to our bathroom were pretty intensive with wall lining patching, new ceiling. The finish result is you cannot see any blemishes etc. Just a great job. Thanks guys.
Work carried out by the owner/operator
Reviewed on 10-07-2020
Partner with Builderscrack
Get work