After we finish the wallpaper stripping, we require the plasterboard walls to be skim coated to a paintable finish - to be done are 2 bedrooms, a hallway and an open-plan kitchen/diner/lounge. Timing is flexible (but this year would be good!) and unit is accessible to measure up for a quote.
#1 | Tradie 1 |
|
166 jobs | No longer in contact |
#2 | Tradie 2 |
|
62 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 13 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work