Job #1 - we have had a new fire installed and unfortunately they had to cut into the gib to line up the wet back pipes. Needs Gib patched and then plastered. Area is approx 60mml x 300mmh on first wall with internal corner then 300mmh x 1400mml on wall that extends behind fire. Installers have told me it is beyond minimum clearance for combustible materials so ok to use standard GIB. Need done ASAP if possible - have included photos for this job Job #2 is a smaller patch in the ceiling where it looks like someone has nearly come through the roof and the total diameter is approx 300mm -
#1 | Tradie 1 |
|
81 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 57 jobs | No longer in contact |
#3 | Tradie 3 |
|
211 jobs | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 2 jobs | No longer in contact |
#7 | Tradie 7 |
|
18 jobs | No longer in contact |
Partner with Builderscrack
Get work