3 x bedrooms that have had the wallpaper stripped need to be plastered and prepared for painting. One bedroom has had gib board replaced. The house has 2 tenants but they are able to vacate for a few days to allow plastering to occur. Timeframe is flexible but within the next month or so.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good communications, and really quick turn around of the job. Good quality work, would recommend.
Work carried out by the owner/operator
Reviewed on 30-09-2021
Partner with Builderscrack
Get work