We have a new build double story extension interior that requires approx 300m2 of level 4 stopping for gib board and eco ply ceilings. Timing anticiapated 1st week november pending current frame drying.. A high standard of professionalism inc health and safety is required and recent references will be checked prior to appointment. Thanks.
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
13 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 25 jobs | No longer in contact |
#4 | Tradie 4 |
|
103 jobs | No longer in contact |
Partner with Builderscrack
Get work