Active job

300m2 of quality L4 stopping needed.

Job description

Interior plastering
Rodney

We have a new build double story extension interior that requires approx 300m2 of level 4 stopping for gib board and eco ply ceilings. Timing anticiapated 1st week november pending current frame drying.. A high standard of professionalism inc health and safety is required and recent references will be checked prior to appointment. Thanks.


Trade professionals

#1 Tradie 1
2 jobs No longer in contact
#2 Tradie 2
13 jobs No longer in contact
#3 Tradie 3 No recent reviews 25 jobs No longer in contact
#4 Tradie 4
103 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo