5x4 in size, with new Gib on walls, requires stopping to a level 4 finish. Ceiling needs a join repaired and a few small holes patched. Work can commence immediately.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-05-2021
Partner with Builderscrack
Get work