Exterior plastering required on 3 arches which have had their corners removed. Additional plastering will be required on newly erected carport which will need plastering to match existing. The photos show the existing round arches with orange garage doors. The second photo shows the square garage entrances which is what we want it to look like. Job to start from 22 July. Access to the property for quoting is on 27 June at 9am.
#1 | Tradie 1 | No recent reviews | 14 jobs | No longer in contact |
#2 | Tradie 2 |
|
12 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 8 jobs | No longer in contact |
Partner with Builderscrack
Get work