Review

Reinstatement after heat pump installation.

Job image

Job description

Interior plastering
North Shore

We are having 2 heat pumps installed on the 23rd of June. There will be 2 slots cut into the wall to accommodate the cables and Pipes these will each be approximately 65 mm wide and about 1.8 long. Fill and stop ready to paint. if possible would like work to be done 24th or 25th of June but following week would be OK.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo