We need a gib-stopper to plaster 2 walls that have been re-gibed in our master bedroom (approximately 14.5m2) plus a few oyjer areas that need patching up. Need to have it done before the 15th of March if possible.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 16-05-2019
Tradesperson reply
"Thank you"
Partner with Builderscrack
Get work