Sorry not much of a job ! Daikin Air Conditioner has been replaced with new one. The existing one 15+ years old had too narrow pipping so a strip of Gib had to be cut away to accommodate the new pipping coming in from under the house. I have the strip of Gib that was cut out. I have added support strips on either side to support the Gib strip so that plastering can now take place.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Quality job. Thanks, Tony Hay
Work carried out by an employee of the company
Reviewed on 07-07-2022
#1 | Tradie 1 |
|
4 jobs | Secured job |
Partner with Builderscrack
Get work