Active job

Gib Stopping of bathroom and bunkhouse Moetapu Bay

Job image
Job image
Job image

Job description

Interior plastering
Marlborough

Gib Stopping of bathroom and bunk house at 36A Moetapu Bay Road. Partially stopped but due to timing job not completed and needs finishing. Probably another coat then final stopping and sanding. Paint finish required. Note that more stopping was done by the builder after these photos were taken. Access to site easy via road, 10 minutes from Linkwater. I can arrange a road pass if needed. Preference for anyone who can do this quickly, but also realistic given the time of year.


Trade professionals

#1 Tradie 1
75 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo