Review

Small Bathroom plastering

Job image
Job image
Job image
Job image

Job description

Interior plastering
Hastings

Small bathroom where we have knocked out a wall between to the toilet. Gib has been done by builder , but most of the room doesn’t need plastering. There is new gib where the wall was, and also on the part that covers up where the door way was. Ceiling needs plastering too. Total room size 1800mm x 2600 mm . Needed with urgency for the week of the 28th of September. Also needed on the exterior of the old doorway in the hallway


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo