Three new wardrobes interiors need gibstopping. Plasterboard is already up. One also needs some on exterior. Builder will be done May 30, booking from then. Two are about 1.7m wide only needing interiors done, the other is 3 m wide and requires some exterior work as well as interior. All are ceiling height inside, in a 1940s house.
#1 | Tradie 1 |
|
51 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
62 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work