Review

gib stopping empty bathroom

Job description

Interior plastering
Gore

Bathroom complete redo, no floor coverings or fixtures to be careful of. Room is lined with wet area gibb board ready for stopping. The room is 2400x2500, 3m stud, with one door and one window. The Gibb has been installed horizontally with the 600mm piece on the lower portion of the wall. There will be seratone covering the bottom 1200mm so only the one horizontal joint, at 1800mm height will need stopped, as well as the corners (above seratone height) and a join above the window. There will be a shower enclosure in one corner also, so will only need stopped above that height.


Review

Workmanship
4.0
Cost
5.0
Schedule
5.0
Communications
4.5

He spent extra hours redoing a section I thought was a bit rough. He was really great about it and didn't make me feel bad for asking. It was an overall quote, so this didn't cost me extra. For such a great price it's not fair to expect it to be perfect and I know I am quite particular and often find fault in commercial buildings. This said, I am happy. I had a flexible schedule so that was easy. Very good at contacting me about progress on the job.

Work carried out by the owner/operator
Reviewed on 07-11-2015

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 1 job Secured job
#2 Tradie 2 No recent reviews 1 job No longer in contact
#3 Tradie 3 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo