We have had the gib installed in the 2 bedrooms. Now we need someone to gib stop, skirting boards etc and finish them to the point they are ready for painting.
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
#2 | Tradie 2 |
|
103 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
#4 | Tradie 4 |
|
56 jobs | No longer in contact |
Partner with Builderscrack
Get work