There is 4.2 long x 2.4m high that needs gob stopping so 10.5m2 in total. The Wall is to take wallpaper but a tidy gib stopping job is still required. The work is to be carried out between the 12th,13th and 14th of November or sooner if possible. The job is on the Manukau Heads, Awhitu Peninsula.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 14-11-2018
#1 | Tradie 1 |
|
172 jobs | Secured job |
Partner with Builderscrack
Get work