Toilet was originally wallpaper. When we removed this to paint the line where the gib connects has not been taped/plastered. Small job which would need to be completed by 20 june as we have carpet being installed. Job is to plaster the connecting line on gib boards and get to smooth surface.we will prime and paint or we have the prime and paint here to finish. We do not have the stuff required to gib stop
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Really great guy. Did what he said for how much he said it would be. Priced well below others.job completed within time frame to a high standard...we will be hiring again
Work carried out by the owner/operator
Reviewed on 24-06-2022
Partner with Builderscrack
Get work