The water has come down the joint in the plasterboard. The joining tape has lifted off the plasterboard. As per photo the section of damage is less than a meter which requires retaping and plastering over. The problem was caused by a leak in a light tunnel which has been fixed and the plaster is now dry.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 22-06-2022