Published on 9 March 2025
After the installation of a log burner several years ago, the ceiling gib has started to crack in the joins. The job is to repair the joins. The cracking is approx. 10m long.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Keen to work hard and complete the job to a high standard.
Work carried out by the owner/operator
Reviewed on 15 April 2025
Tradesperson reply
"Was a pleasure"
Partner with Builderscrack
Get work