Published: 27 August 2024
Crack in the ceiling plasterboard in the walk in robe on the second floor - top floor. Currently approximately 1 meter long running along the room approximately 20cms from the wall and 20cms from the end of the room. Room is approximately 3 meters long. Building has a flat roof, so no internal access to the ceiling space.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very efficient, did the job in a timely manner and cleaned up. Recommend this tradesman.
Work carried out by the owner/operator
Reviewed on 29-08-2024
Partner with Builderscrack
Get work