I am after a good gib stopper to stop to level 4 a new room in Mt Eden. The job will be ready from Friday November the 20th. The job needs to be done as soon as possible after this date 45 sq metres wall 30 sq metres ceiling 52 metres square stop 32 metres slim lines slim lines will be installed ready to stop
Workmanship |
2.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
3.0
|
Work carried out by the owner/operator
Reviewed on 23-06-2022