Published on 31 March 2025
One sheet of aqualine has been cut out and will be replaced in bathroom tomorrow. I then need it plastered and skimmed to match rest of bathroom. Also a small gib repair needs plastering in adjacent room (gib to be fixed tomorrow). Need it done over this week, very flexible on timing. I will paint walls.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Anna and Maria did a fantastic job, and were very efficient, accommodating and cost effective. They managed to prioritize my job with 1 day notice and stayed until the job was done. Highly recommend them.
Work carried out by the owner/operator
Reviewed on 8 April 2025
Partner with Builderscrack
Get work