Review

plaster interior of new build

Job description

Plasterboard Installation
Western BOP

gib fixing and stopping.house is about 160 sq m, single story.About 1/3 is wall ties to ceiling height. 2.4m stud height. Square stopping required


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Simply the best. Very proactive when confronted with a problem requiring a design solution. Can really think outside the box. Very happy with the final result. Highly recommended.

Work carried out by the owner/operator
Reviewed on 30-01-2018

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo