We were having the asbestos removed from our stippled ceiling and it’s turned out we’ve had to remove the whole ceiling, cut and drop so now need to look at installing new gib throughout the house and gibstopping. As the asbestos removal is still underway there’s is no access to the house to have a look for likely another week. We expect to move back in at the end of next week after the certification is given, so we’d like to get the ceiling in soon after that. There is approx 90m2 of ceiling, 3 bed house 1 bathroom 1 toilet 1 laundry 1 lounge 1 dining / kitchen 1 L shaped hallway. I’ve added a couple of pictures of the lounge and kitchen ceilings pre removal.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Communication was great with Wayne, there was a lot of organising to do and it was all so easy. Wayne was straight into the job as soon as it was ready for him and kept on working from start to finish. We're very happy with the finished product.

Work carried out by the owner/operator
Reviewed on 04-05-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo