Wanting full bathroom aqua gibbed. Needs to be done around the end of the week/early next week. Photo is with the average wall height. One wall is brick (fire wall) ceiling will need to be done. All old gib will already be removed. And the shower pan will be installed.
#1 | Tradie 1 |
|
143 jobs | No longer in contact |
#2 | Tradie 2 |
|
29 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work