Review

Bedroom lininng and stopping

Job image
Job image
Job image

Job description

Plasterboard Installation
North Shore

In our 1970s do up we have three bedrooms (sized 3.5m * 3.5m 3.6m * 2.8m 2.75m * 2.6m ) we have pulled the gib off the walls because 1, it was in such poor condition, 2, we wanted to install pink Batts and 3, we wanted additional power points adding. We need someone to reline the walls with Gib, stop the Gib, install new architrave round the windows, cupboards, ceiling and floor. So it is ready for us to paint. Note the pictures are before the Gib was removed In a forth bedroom (sized 3.9m * 3.9m) the have pulled off 70s ceiling tiles - there is Gib underneath but it needs stopping as the are some holes in it. Thanks Matt


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Andrew is an excellent person to have on your project he is a problem solver with a great work ethic and cheerful approach to the job. I would have no hesitation in recommending him.

Work carried out by the owner/operator
Reviewed on 07-01-2019

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 37 jobs Secured job
#2 Tradie 2
152 jobs No longer in contact
#3 Tradie 3 No recent reviews 43 jobs No longer in contact
#4 Tradie 4
83 jobs No longer in contact
#5 Tradie 5 No recent reviews 52 jobs No longer in contact
#6 Tradie 6
172 jobs No longer in contact
#7 Tradie 7 No recent reviews 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo