Water damaged wall. Job requires fixing leak from above, removing moisture damaged jib board, assessing framing status and replacing if necessary, re jibbing, plastering and painting. Photos and reporting to be done by email, Owner overseas.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Pleasure to deal with Stuart, professional service all round. Thanks
Work carried out by the owner/operator
Reviewed on 14-01-2019
Tradesperson reply
"Job description changed a couple of times,however the result was very pleasing & a great customer to deal with,thanks"
Partner with Builderscrack
Get work