We have a dropped ceiling in our hallway and would like to remove it and raise it up to match the height of the rest of the house. Assume this will mean new plasterboard throughout the hallway so that too and a new cupboard/cover built to hide the power box. Ideal timeframe: work to begin sometime within the next 4 weeks.
#1 | Tradie 1 |
|
98 jobs | No longer in contact |
#2 | Tradie 2 |
|
107 jobs | No longer in contact |
#3 | Tradie 3 |
|
146 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 40 jobs | No longer in contact |
Partner with Builderscrack
Get work