Active job

Shift manhole

Job image

Job description

Plasterboard Repair
Christchurch

I would like to have the manhole cover from the ceiling in our hallway moved over from the gab between the ceiling joists it is currently in to the adjacent gap to enable us to install a solar tube where the manhole is currently placed. This will involve cutting a new hole and if possible reusing the current manhole frame. Then cover the current manhole with gib, stop and sand ready for painting. In the attached picture it is moving to the location indicated by the red square. The ceiling height is 2.4 metres.


Trade professionals

#1 Tradie 1 No recent reviews 39 jobs No longer in contact
#2 Tradie 2
211 jobs No longer in contact
#3 Tradie 3 No recent reviews 4 jobs No longer in contact
#4 Tradie 4 No recent reviews 9 jobs No longer in contact
#5 Tradie 5 No recent reviews 42 jobs No longer in contact
#6 Tradie 6
56 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo