Post flood repairs - clean up already completed with bare rooms - some flooring & lower (1200mm) gib removed, Kitchen/Bathroom/dining/one bedroom needs gib board replaced up to 1200 mm (preparatory work is completed) and two need ply based flooring put down - clean timber i.e. some preparatory work done. Further work can be discussed including refit of existing Kitchen/bathroom fittings.. All materials can be supplied and owner available as labourer.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
This was a complicated job on a quirky building with few straight lines and not many level surfaces. Mason did the work with competence and lateral thinking.
Work carried out by the owner & subcontractors
Reviewed on 29-01-2018
Tradesperson reply
"Thanks again Kerry has been a pleasure working with you"