I’m getting pre-pipe installation for a heatpump unit which requires a section of gib cut out. This will happen on the 27th of April. I need this repaired/patched up and painted too (if possible). Require this to be done on the 28th of April before final install of the heat pump units on the 30th. Picture indicates area approximately to be cut out.
#1 | Tradie 1 |
|
67 jobs | No longer in contact |
#2 | Tradie 2 |
|
74 jobs | No longer in contact |
#3 | Tradie 3 |
|
172 jobs | No longer in contact |
Partner with Builderscrack
Get work