Hi there. Two walls of our sleepout have been water damaged causing staining, bubbling and malformation of the walls. The material doesn't seem to be normal gib but perhaps MDF. We are having carpet laid Friday 29th of November and have a preference for this work being done prior to this.
#1 | Tradie 1 | No recent reviews | 25 jobs | Secured job |
#2 | Tradie 2 |
|
172 jobs | No longer in contact |
#3 | Tradie 3 |
|
122 jobs | No longer in contact |
#4 | Tradie 4 |
|
218 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work