Published on 13th August 2025
1920 single floor bungalow needs full borer treatment on August 27th, there is subfloor borer that hasn’t been treated and internal borer that has been consistently treated
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Fantastic to work with"
Work carried out by the owner/operator
Review posted by Christina on 4th September 2025
Verified Builderscrack review
Partner with Builderscrack
Get work