extension to concrete drive and grilled gutter. Between new shed and existing concrete drive. Note the existing pad in front of the garage will need to be cut in about a metre and then broken up and a new section layed up to a grilled ground gutter in front of the new shed pad. Also the exstension to the old pad will be about 1.5 metres wide and 8 metres long.