Published: 25 September 2024
Looking at a cost effective way to do some pathways and remove the red brick. I was looking at paving with pebbles in between but believe in situ concrete could be a better option. Unsure how many paths would be in budget but would be interested to hear from anyone interested in quoting.
#1 | Tradie 1 |
|
20 jobs | In contact |
#2 | Tradie 2 |
|
100 jobs | Quoted |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 |
|
29 jobs | No longer in contact |
Partner with Builderscrack
Get work