Published on 15th December 2025
Supply & lay concrete. Approx 4.7 cubic metres (my calculations) in 2 depths. Reinstate channel cut to instal storm & wastewater pipes & new garage entry apron @ 100mm thick plus new side path @ 80mm thick (see photos attached). Channel is 14.13m long x 0.6m wide, apron 9.82m L x 3.02 W, path 8.6m L x 1.22m W. Some prep work (base course & compacting) still to be completed so not expecting job to be done before Xmas.
| Quality of work |
4.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
4.0
|
Their professionalism and responsiveness |
"Hayden listened to what I required. Understood what we were trying to achieve & delivered the result we were expecting."
Work carried out by the owner & subcontractors
Review posted by BRIAN on 11th March 2026