Published on 2 December 2024
1. Existing planter box - remove old planks, move edge of planter box and add new plank 2. Remove old gravel/roadmillings next to house 3. Concrete slab up to where the house sticks out - reinforced - 2 x posts for gate - one drain to be aware of - water drainage options (cesspit that ties into existing drainage) 4. New planter box for about 10x0.8m 5. New aggregate/gravel with square stepping stones (we can provide the stepping stone) from concrete to shed - small river stones or something similar that doesn't have sharp edges.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brian and his team did an excellent job, communications was great and they arrived as scheduled. Workmanship was excellent and exactly what we wanted.
Work carried out by the owner/operator
Reviewed on 23 January 2025
Partner with Builderscrack
Get work