We have 2 bedrooms (double size), hallway (5m) and some doors (7 doors with frames) that require painting. Undercoat completed on 80%. Two top coats required. Single colour in rooms. This job must be completed by 4pm Monday 7th Dec. Access both Saturday and Sunday available to the house. Paint and equipment supplied as required. Access available immediately.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Carlos was great to deal with.
Reviewed on 14-01-2021
#1 | Tradie 1 |
|
15 jobs | Secured job |
#2 | Tradie 2 |
|
103 jobs | No longer in contact |
#3 | Tradie 3 |
|
205 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work