Painting of plastic spouting and fascia board, 2 gable ends and strips above windows. Front of house and part of one side already done. Balance of that side is 2 storeys part of which is over sloping path. Rear of house is 2 storey. Part of the other side of house is above sloping driveway. Paint will be supplied by me. Existing paintwork in good condition so not too much prep work needed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 11-03-2014
Tradesperson reply
"Thank you, it was a pleasure to do business with you."